Saturday, March 10, 2012

Tons of Garage Work

Alan came over to work on his car, but decided against it after some consideration.

Instead, we did a bunch of garage work, taking down shelves (only about 1/6 of them so far...), putting up some new shelves from Home Depot, taking down the old gas pipe that was cemented in and went nowhere, taking down some PVC that was ALSO cemented in and went nowhere, taking out dead power lines, disconnecting useless phone cables, and ripping out tons of other ridiculous things. This garage has clearly NEVER been refactored before.

When my dad comes out in a few weeks we're gonna redo all of the electrical, so I'd better have everything ripped off of the walls by then. The garage is gonna feel HUGE when all of the shelves are down.

No comments:

Post a Comment